Analysis on the influence factors in the compaction test 影響土樣擊實試驗結(jié)果的試驗分析
Data processing of geo - technical compaction test using computer 土工擊實試驗數(shù)據(jù)處理的計算機實現(xiàn)
Reliability study on the compaction test results of xiaolangdi project 小浪底工程擊實試驗結(jié)果的可靠性研究
Proctor compaction test 普氏壓實試驗
In the paper , through the compaction test , the optimum moisture content and maximal dry density of aeolian sand are determined 本文通過擊實試驗,確定了風(fēng)積沙的最佳含水量和最大干密度。
Tests relating to pavements . compaction tests on non - bituminous materials . part 2 : compactibility using the gyratory testing machine 路面試驗.不含瀝青粘結(jié)劑材料的壓實.第2部分:旋轉(zhuǎn)剪切機壓實試驗
It can serve as reference material for projects of similar nature , such as compaction test process , results , test equipment and technical methods etc 工程的碾壓試驗過程、結(jié)果,和試驗設(shè)備的配置、工藝方法等,可為同類工程參考。
At present , the maximum dry density , which is a very import parameter of the degree of compaction , is ascertained by standard indoor compaction test 目前,對于公路工程路基土施工質(zhì)量壓實度檢測應(yīng)用的最大干密度是通過室內(nèi)標(biāo)準(zhǔn)擊實試驗來確定。
Large - scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction 摘要盤石頭水庫面板堆石壩,在填筑前進行了大型碾壓試驗,復(fù)核設(shè)計壓實標(biāo)準(zhǔn),確定各區(qū)筑壩材料的填筑參數(shù),供壩體施工采用。
Generally , no less than one compaction test is needed for any earth sample . when the sample has a little change , it is necessary to carry out another test , which would have great influence on construction schedule 一般一種土樣至少需要做一個擊實試驗,土樣稍有變化又需另作,從而給檢測、監(jiān)理人員造成較大負(fù)擔(dān),往往對施工進度有較大影響。